Pretpark.club just announched they recieved information about the possible future of the famous inverted rollercoaster Nemesis at the British themepark Alton Towers.
This old rollercoaster seems to be in need of some major maintenance work. And the rumors are telling us the full retrack work, which the coaster needs, can be to expensive for park owner Merlin.
Will this famous rollercoaster be fully demolished and replaced with something else and probably much cheaper, or will it be a full retrack? All the fans hope it will be the second option. We all have to wait and see which option Merlin will choose.