For the first time in about a month, work is being done directly on the track again. From the park, the B&M serial number WI-S was visible on the front rail sections.
The construction work at the station is progressing. The operator’s house and the two foundations of the towers are now clearly visible on the flat ride. In addition, further concrete foundations are currently being built at various points on the site.
Source: https://coasterfriends.de/freizeitparkforum/index.php?threads/2023-neuheit-themenbereich-lego-mythica-b-m-wing-coaster-flatride-legoland-deutschland.16370/post-1242705