More trackwork is installed

In one week time, a lot of new track for the Surf Coaster got installed at SeaWorld Orlando. Construction is on surge @SeaWorld #Pipeline pic.twitter.com/dxa3h6x0jj — The Coaster Crew (@Coastercrew) November 5, 2022

Tallest point of new coaster is reached

In Orlando Florida, the tallest point of the new Surf Coaster being build at SeaWorld was reached.
Just check out the new pictures.

Pipeline, the new Surf Coaster for SeaWorld Orlando

SeaWorld Orlando has just announched their new rollercoaster, and it will be called “Pipeline”. Dit bericht op Instagram bekijken Een bericht gedeeld door SeaWorld Orlando (@seaworldorlando) More info: https://seaworld.com/orlando/roller-coasters/pipeline/

More about the new “World of Jumanji” area

The Dutch themepark related website “Themepark Magic” has some recent photo’s from the new area being constructed at the English themepark Chessington World of Adventures. Z

SeaWorld Orlando finally announces new Surf Coaster

According to this Instagram post, SeaWorld Orlando will announce their new B&M coaster later next week. Dit bericht op Instagram bekijken Een bericht gedeeld door SeaWorld Orlando (@seaworldorlando)

More track is finally in it’s place now

For the first time in about a month, work is being done directly on the track again. From the park, the B&M serial number WI-S was visible on the front rail sections. The construction work at the station is progressing. The operator’s house and the two foundations of the towers are now clearly visible on …

More about the Statue, the station and the area

The work on the new themed area at the English themepark Chessington World of Adventures, keeps on going.This you can see on the current photo’s from the constructionsite. Source: https://coasterforce.com/forums/threads/cwoa-project-amazon-world-of-jumanji-b-m-wing-coaster-2023.44747/post-1142659

First track supports going vertical

A support for the zero-g roll has gone vertical! We’ve been there every step of the way… So you won’t be surprised that we bring you…. (insert drum roll 🥁) The first of the new coaster supports are VERTICAL at World of Jumanji™ – P pic.twitter.com/eybB9B0yvb — Chessington Buzz 🎃👻😱 (@ChessingtonBuzz) September 12, 2022 Source: …

More work on the station, the statue and the flatrides

Work continues with more rockwork being added to the statue as well as walls for the station and foundations for the flat rides. Source: https://coasterforce.com/forums/threads/cwoa-project-amazon-world-of-jumanji-b-m-wing-coaster-2023.44747/post-1141731